Detonators
 
Name USES
Ordinary Electric Detonator For the blasting works in well mining where present no fire damp or coal dust, or in the open pit, digging tunnels, road-construction, building water conservancy projects, etc.
Ms Delay Electric Detonator It is suitable for the blasting works in coal mine or in open pit where present no fire damp or coal dust.
Coal Mine Ms delay electric detonator The detonator adapts for the blasting works in coal mine, the site if the open air, etc. in which allow to contain fire damp or coal dust.
Seismic Protecting Electric Detonator It can used for detonating vibrating sources which produce seismic waves, finding out geological structure, the distribution condition of petroleum and mineral resources.
Electric Detonator Temperature Resistant It is suitable for initiating perforator in oil well and other lasting works under high temperature.
Electric Detonator-Temperature and Pressure Resistant It is suitable for initiating perforator in oil well and other lasting works under high temperature and high pressure
Safety Electric Detonator -Temperature Resistant It is suitable for initiating perforator with barrel in the oil field
Safety Electric Detonator-Temperature and pressure resistant It can be used for initiating perforator without barrel in the oil field.
Ordinary Shock Tube Detonator It is suitable for the blasting work in coal mine or in the open pit digging tunnel where present no fire damp or coal dust. when used.
The shock Tube Delay Detonator It is suitable for the blasting works in coal mine or in the open pit digging tunnels where present no fire damp or coal dust. Transmissions when used.
The Shock Tube Delay Initiation System It is suitable for the blasting works in coal mine or in the open pit digging tunnels where present no fire damp or coal dust.
The Shock Tube Trunkline -Delay System It is suitable for the blasting works in coal mine or in the open pit digging tunnels where present no fire damp or coal dust.
The MS Two Way Relay of Shock Tube It is suitable for the blasting works in coal mine or in the open pit digging tunnels where present no fire damp or coal dust. when used.
Two Ways Detonating Relays It is suitable for the blasting works in coal mine or in the open pit digging tunnel where present no fire damp or coal dust.
Capped Fuse It is suitable for the blasting works in coal mine where present no fire damp or coal dust, or an open pit.
UN.NO: UN0061
 
       
Ordinary Electric Detonator
Ms Delay Electric Detonator
Coal Mine Ms delay electric detonator
Seismic Protecting Electric Detonator
 
Electric Detonator Temperature Resistant
Electric Detonator-Temperature and Pressure Resistant
Safety Electric Detonator -Temperature Resistant
Safety Electric Detonator-Temperature and pressure resistant
 
Ordinary Shock Tube Detonator
The shock Tube Delay Detonator
The Shock Tube Delay Initiation System
The Shock Tube Trunkline -Delay System
 
The MS Two Way Relay of Shock Tube
Two Ways Detonating Relays
Capped Fuse
       
 
  Home | Mining | Oil & Gas | Contact Us    
 

Copyright © 2014 Raywell Chemical Group Company Limited. All Rights Reserved.