| Name |
USES |
| Ordinary Electric Detonator |
For the blasting works in well mining where present no fire damp or coal dust, or in the open pit, digging tunnels, road-construction, building water conservancy projects, etc. |
| Ms Delay Electric Detonator |
It is suitable for the blasting works in coal mine or in open pit where present no fire damp or coal dust. |
| Coal Mine Ms delay electric detonator |
The detonator adapts for the blasting works in coal mine, the site if the open air, etc. in which allow to contain fire damp or coal dust. |
| Seismic Protecting Electric Detonator |
It can used for detonating vibrating sources which produce seismic waves, finding out geological structure, the distribution condition of petroleum and mineral resources. |
| Electric Detonator Temperature Resistant |
It is suitable for initiating perforator in oil well and other lasting works under high temperature. |
| Electric Detonator-Temperature and Pressure Resistant |
It is suitable for initiating perforator in oil well and other lasting works under high temperature and high pressure |
| Safety Electric Detonator -Temperature Resistant |
It is suitable for initiating perforator with barrel in the oil field |
| Safety Electric Detonator-Temperature and pressure resistant |
It can be used for initiating perforator without barrel in the oil field. |
| Ordinary Shock Tube Detonator |
It is suitable for the blasting work in coal mine or in the open pit digging tunnel where present no fire damp or coal dust. when used. |
| The shock Tube Delay Detonator |
It is suitable for the blasting works in coal mine or in the open pit digging tunnels where present no fire damp or coal dust. Transmissions when used. |
| The Shock Tube Delay Initiation System |
It is suitable for the blasting works in coal mine or in the open pit digging tunnels where present no fire damp or coal dust. |
| The Shock Tube Trunkline -Delay System |
It is suitable for the blasting works in coal mine or in the open pit digging tunnels where present no fire damp or coal dust. |
| The MS Two Way Relay of Shock Tube |
It is suitable for the blasting works in coal mine or in the open pit digging tunnels where present no fire damp or coal dust. when used. |
| Two Ways Detonating Relays |
It is suitable for the blasting works in coal mine or in the open pit digging tunnel where present no fire damp or coal dust. |
| Capped Fuse |
It is suitable for the blasting works in coal mine where present no fire damp or coal dust, or an open pit. UN.NO: UN0061 |